Industrial EngineeringCourse project
A desktop conveyor line used to measure how buffer size and station timing change throughput.
StageCompleted, Stage 7 of 7
Find the bottleneck on a line before buying more equipment.
A three-station desktop line that changes one setting at a time, documented for use as a teaching aid.
Three PLC-controlled stations with sensors logged every part; the team varied one setting at a time.
| # | Part | Qty |
|---|---|---|
| 01 | Belt conveyor | 1 |
| 02 | Stations | 3 |
| 03 | PLC | 1 |
| 04 | Photoelectric sensors | 6 |
Package the rig and its exercises for teaching.
No test results have been published for this project yet. Measured results will appear here once the team records them.
No competition results recorded yet.
First names and initials only, as on every public page.
Enquiries reach the team through the society’s Projects Committee.